Difference between revisions of "Project File:Subsurface Drainage Network – Optional"
From Gsshawiki
(→3.12.1 Specifying the Methods) |
|||
Line 10: | Line 10: | ||
|- | |- | ||
| <pre>STORM_SEWER</pre> || ''filename.spn'' || Card specifies that subsurface drainage be performed and identifies the input file that describes the newtork connectivity and physical description. | | <pre>STORM_SEWER</pre> || ''filename.spn'' || Card specifies that subsurface drainage be performed and identifies the input file that describes the newtork connectivity and physical description. | ||
− | | | + | |} |
+ | |||
The following card is REQUIRED for the simulation of non-SUPERLINK subsurface drains. | The following card is REQUIRED for the simulation of non-SUPERLINK subsurface drains. | ||
Revision as of 18:40, 4 October 2018
Subsurface drains can be simulated with either SUPERLINKS and/or a simple link/node routing package. The inputs are similar
Contents
3.12.1 Specifying the Methods
The following card is REQUIRED for the simulation of SUPERLINK subsurface drains.
Card | Argument | Description |
---|---|---|
STORM_SEWER |
filename.spn | Card specifies that subsurface drainage be performed and identifies the input file that describes the newtork connectivity and physical description. |
The following card is REQUIRED for the simulation of non-SUPERLINK subsurface drains.
Card | Argument | Description | |||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
STORM_DRAIN |
filename.spn | Card specifies that subsurface drainage be performed and identifies the input file that describes the newtork connectivity and physical description. |
} 3.12.2 Optional InputsThe following cards are REQUIRED for the simulation of subsurface drains.
3.12.3 Output CardsThe following cards are REQUIRED for the simulation of subsurface drains.
GSSHA User's Manual
|