Search results

From Gsshawiki
Jump to: navigation, search
  • ==Outlet information== {{Model_Construction:Outlet information}}
    5 KB (532 words) - 19:56, 7 October 2008
  • ...put ASCII file containing channel network connectivity and cross-sectional information for each link/node. ...|| ''file name'' || Input ASCII file containing channel/grid connectivity information.
    8 KB (1,142 words) - 18:11, 5 April 2013
  • ...OPE ##.##</pre> || ''real'' || Slope of the cell containing the watershed outlet.<br>Must be positive. Not required if '''DIFFUSIVE_WAVE''' is specified. | <pre>OUTROW ##</pre> || ''integer'' || The raster row where the catchment outlet is located. Not required if '''DIFFUSIVE_WAVE''' is specified.
    2 KB (351 words) - 05:32, 22 July 2008
  • ...>SUMMARY "filename.sum"</pre> || ''file name'' || Output file summarizing information on options selected, inputs read, simulation results, mass conservation, an ...le name'' || Output file containing time series discharge at the catchment outlet. (m<sup>3</sup>/s default or, ft<sup>3</sup>/s if '''QOUT_CFS''' card is s
    11 KB (1,753 words) - 16:52, 24 June 2013
  • ...river, pond, or lake, or when a hydraulic structure is near the watershed outlet. The up-gradient method of computing inter-node discharges allows the head ...nd the saturated groundwater grid. The '''CHAN_INPUT''' file contains the information necessary to connect the stream network and assign attributes to each of th
    60 KB (7,451 words) - 18:55, 26 April 2019
  • ...er" method are no longer input for versions 5.7 and beyond. The following information is annotated for this change in the model. ...city. You can select the appropriate equation for your model based on the information in this manual and in [[media:sediment_TN.pdf|this Sediment Technical Note]
    20 KB (2,913 words) - 17:39, 15 June 2015
  • ...(for allowing the water to drain off the grid in a location other than the outlet cell), ID 2 is a time-variable specified head and the boundary value of 2 i ...o so that the file is human-readable. These fields can contain any desired information, however, as GSSHA simply ignores them. The same applies for the text line
    39 KB (4,240 words) - 23:22, 27 September 2023
  • ...les name “mask.map” and “elev.map”, respectively. Notice that the outlet of the catchment is in row 6 and column 10 of the DEM. This is the lowest ...r a duration of 2 h (120 min). The simulation will run for 2000 min. The outlet hydrograph will be output every 30 minutes. Notice that lines that begin wi
    4 KB (404 words) - 20:12, 21 July 2008
  • ...e catchment is determined from the overland flow/channel flow connectivity information provided by the link and node maps. ...o the project file, including the WMS release verion, and the GIS like map information in the FLINE card. GSSHA ignores these and any other unrecognized project
    4 KB (502 words) - 20:11, 21 July 2008
  • ...h (not stage) may be specified at the outlet of the model. To specifiy the outlet water surface depth, you must include the card: ...E_SERIES_FILE''' cards may be used. See Chapter 17 of the manual for more information on the '''TIME_SERIES_FILE''' and required format.
    861 bytes (146 words) - 21:00, 24 February 2016
  • :*[[Model_Construction:Outlet information|Outlet information]]
    6 KB (639 words) - 19:54, 7 October 2008
  • ...o a drainage network. To specify a drain flows into a SUPERLINK node, the outlet type for the drain should be type 666 and the input should be the SUPERNODE For more information about defining subsurface drainage information using WMS, visit the [http://www.xmswiki.com/xms/WMS:Pipe_and_Node_Paramete
    6 KB (896 words) - 18:54, 4 October 2018
  • ...put ASCII file containing channel network connectivity and cross-sectional information for each link/node. ...|| ''file name'' || Input ASCII file containing channel/grid connectivity information.
    8 KB (1,185 words) - 19:02, 26 April 2019
  • ...>SUMMARY "filename.sum"</pre> || ''file name'' || Output file summarizing information on options selected, inputs read, simulation results, mass conservation, an ...le name'' || Output file containing time series discharge at the catchment outlet. (m<sup>3</sup>/s default or, ft<sup>3</sup>/s if '''QOUT_CFS''' card is s
    13 KB (2,080 words) - 20:18, 20 February 2018